European Federation of Agencies and Regions for Energy and the Environment



Brunsmo Wind Power Blekinge, Sweden

The installation of five 2.5 MW wind turbines in Brunsmo, 30 km north from Karlskrona, has been completed in 2010.



Country

Sweden

Start Date

2010

Website

www.energimyndigheten.se/Global/Om%20oss/Vindkraft/Vindpilotprojekt/Slutrapport%20-%20Brunsmo.pdf

Share


The installation of five 2.5 MW wind turbines in Brunsmo, 30 km north from Karlskrona has been completed in 2010. The three blade up-wind turbines have been delivered by GE Wind Energy in Germany. Hub height as well as rotor diameter is 100 m, a synchronous generator with full power is installed and pitch control and variable wind speed are available.
The location Brunsmo is characterized by an average wind speed 6.5 m/s at hub height. In total, the five turbines generate 30 GWh (estimated figures), that means 2400 full-load hours per year.

Contacts
Organisation

Project contact

Email